Bialystok University of Technology
Wiejska 45A Street, 15-001 Białystok
The Construction and Environmental Engineering Department of the Bialystok University of Technology has undergone a comprehensive thermomodernisation. In order to reduce energy demand for heating and ventilation, changes were made to the central heating system, mechanical ventilation system and the body of the building.
Klimor devices met the high design requirements for air comfort. Klimor delivered standard MCKS ventilation units with heat recovery with a rotary heat exchanger and a total air output of 55,000 m3/h.
Type of device: MCKS
Type of heat recovery: rotary
Contractor: Dartom Skup Sawicki Sp. J.
Total capacity of the devices: 55,000 m3/h