MK Sp. z o.o. Żary
Wiśniowa 24 Street, 68-200 Żary
The production and storage hall of MK Sp. z o.o. was commissioned in 2017, and the new office building is planned to be open.
2 Klimor MCKS AHUs equipped with heat recovery with a rotary and cross-flow exchangers and gas heating modules were installed in the operating hall. These devices cooperate with Klima-Therm by Clint CHA/K series chilled water units. Moreover, 18 Fujitsu Split devices and KCX recuperator were installed in the facility. Several 7 MCKS AHUs with supply and exhaust air parameters of 59,500 m3/h, Fujitsu Airstage VRF V-III comfort air conditioning system and 2 Fujitsu Split units were delivered to the office building.
Type of device: MCKS, Fujitsu Airstage VRF V-III, Split Fujitsu, Klima-Therm by Clint
Type of heat recovery: rotary, cross-flow
Contractor: PB Klima Piotr Borek
Total capacity of the devices: 59,500 m3/h