Wolności 8 Street, 67-100 Nowa Sól
The Nadodrzanski Dwór hotel complex in Nowa Sól was built as a result of renovation and extension of the old shooting-range. In 2017, the first part of the building including a restaurant, a wedding hall and a bowling alley was opened. Klimor delivered 4 MCKS air handling units with heat recovery with a rotary exchanger matching with 2 VRF V-III units. The Fujitsu Airstage VRF V-III comfort air-conditioning system, the Fujitsu Split, a KCO recuperator and 2 Fujitsu Waterstage heat pumps used for underfloor heating were installed in the same part of the building.
Type of device: MCKS, Fujitsu Airstage VRF V-III, Fujitsu Waterstage, Fujitsu Split, KCO
Type of heat recovery: rotary
Contractor: PB Klima Piotr Borek
Total capacity of the devices: 18,500 m3/h