University Clinical Hospital in Białystok
Marii Skłodowskiej-Curie 24A Street, 15-276 Białystok
University Clinical Hospital in Białystok is the most advanced healthcare facility in the Podlaskie voivodeship. The existing hospital building has been modernized and the new building has been erected there. Innovative design and modern equipment improve working conditions and increase the patients well-being. The new equipment used in the investment project includes ventilation systems provided by Klimor. MCKH hygienic AHUs, standard MCKS and suspended MCKT with different air parameters, with glycol, rotary and cross-flow exchanger with built-in cooling systems are installed there.
Type of device: MCKS, MCKH, MCKHT
Type of heat recovery: rotary, cross-flow, glycol
Contractor: Instal Białystok S.A., Przedsiębiorstwo Usługowo Produkcyjne Calwent Szuchnicki, Legun Spółka Jawna
Total capacity of the devices: 440,000 m3/h